The roof structure of the Blending silos consist of Pre-cast beams (up to 1m depth and 16m span), Pre-cast slabs & concrete flooring. All the pre-cast casting and erection (up to 45m height) were carried out by Tahtan.
Project Location : Takreer Refinery, Ruwais, Abu Dhabi, UAE
Year of Execution : 2014 – 2016
Client : Takreer Refinery
EPC / General Contractor : Samsung Engineering Ltd.
Work Description : General Construction, Slipform, Pre-cast, Painting