CONSTRUCTION OF GREEN COKE B/S, TAKREER REFINERY, ABU DHABI, UAEpost id457endhere457Scope of work comprised of slipform construction of Green Coke / Blending Silos (04 No., H = +43m, Dia. 12.5m and starting from +28m) at TAKREER Refinery, Ruwais including the construction of silo’s roof structure & painting works.

no page template defined

The roof structure of the Blending silos consist of Pre-cast beams (up to 1m depth and 16m span), Pre-cast slabs & concrete flooring. All the pre-cast casting and erection (up to 45m height) were carried out by Tahtan.

 

Project Location : Takreer Refinery, Ruwais, Abu Dhabi, UAE

Year of Execution : 2014 – 2016

Client : Takreer Refinery

EPC / General Contractor : Samsung Engineering Ltd.

Work Description : General Construction, Slipform, Pre-cast, Painting