The roof structure of Calcination silos consist of steel structure, built-up girders of 2.5m depth, 30m span and erection height up to 60m, roof decking and concrete flooring. All the fabrication, erection & heavy lifting activities were performed by Tahtan.
Project Location : Takreer Refinery, Ruwais, Abu Dhabi, UAE
Year of Execution : 2014 – 2016
Client : Takreer Refinery
EPC / General Contractor : Samsung Engineering Ltd.
Work Description : General Construction, Slipform, Painting, Steel Structure, Profile Decking, Heavy Rigging