CONSTRUCTION OF COKE PRODUCT STORAGE SILOS, TAKREER, RUWAIS, ABU DHABI, UAEpost id456endhere456Scope of work comprised of slipform construction of Coke Product / Calcination silos (06 No., H = +55m and Dia. 30m) at TAKREER Refinery, Ruwais including the construction of silo’s roof structure, painting / insulation and equipment support works.

no page template defined

The roof structure of Calcination silos consist of steel structure, built-up girders of 2.5m depth, 30m span and erection height up to 60m, roof decking and concrete flooring. All the fabrication, erection & heavy lifting activities were performed by Tahtan.

 

Project Location : Takreer Refinery, Ruwais, Abu Dhabi, UAE

Year of Execution : 2014 – 2016

Client : Takreer Refinery

EPC / General Contractor : Samsung Engineering Ltd.

Work Description : General Construction, Slipform, Painting, Steel Structure, Profile Decking, Heavy Rigging